Bridge
Work - |
Construction of RCC Box Culvert , Daund. |
Location :
Daund, Baramati Section. |
Name of
Client : Daund |
 |
Date
of Starting :
Date of Completion :
Approximate Value of the Project : 22.40 Lakhs.
Brief Description of Project :
Box culverts are made up of concrete and especially, RCC (Reinforced Concrete). The most challenging part in constructing a box culvert is that dry surface is needed for installing it. However, due to the strength of the concrete floor, water direction can be changed when a large amount of water is expected.
This RCC Box Culvert was constructed by us costing Rs. 22.40 Lakhs.
|
 |
|